Power supply system for autonomous vehicle and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12233721
APP PUB NO 20240166054A1
SERIAL NO

18213637

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment a power supply system includes a low voltage DC/DC converter (LDC) configured to convert a high voltage into a low voltage, a main battery configured to be charged by the LDC and to supply power to a junction block divided into an essential load part and a general load part, a control block comprising a first power switch configured to control power between the LDC and the junction block, a second power switch configured to control the power between the main battery and the junction block, and a load switch configured to selectively cut off the power to the general load part and an auxiliary battery configured to selectively supply power to an auxiliary junction block.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYUNDAI MOTOR COMPANY; KIA CORPORATION; THN CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Je Hyun Seoul, KR 8 83
Kim, Young Ho Seoul, KR 253 3236
Kwon, Oh Kab Seoul, KR 2 2
Park, Sang Wook Hwaseong-si, KR 169 1239
Yoo, Kuk Hyeon Seoul, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00