Front pillar structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12233943
APP PUB NO 20230382462A1
SERIAL NO

17991194

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment front pillar structure includes a side outer reinforcement assembly, a first reinforcement member coupled to a front portion of the side outer reinforcement assembly to define a first guide passage through which a flexible part having a predetermined length and mounted to the front pillar structure is introduced, a second reinforcement member coupled to a rear portion of the side outer reinforcement assembly to define a second guide passage through which the flexible part is drawn, and a side inner panel assembly coupled to the side outer reinforcement assembly, the side inner panel assembly including an introduction hole connected to the first guide passage and a draw hole connected to the second guide passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797 06797
KIA CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Yoonkyoung Suwon-si, KR 9 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00