Pneumatic conveyance leveling system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234110
APP PUB NO 20240025676A1
SERIAL NO

17872427

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exemplary system for filling a holding tank with agricultural product generally includes a supply line. The supply line includes an inlet, a plurality of outlets, and a plurality of junctions. The inlet is connected with a conveyance device such that the supply line is operable to receive a flowing agricultural product blown by the conveyance device. The outlets are open to a holding space of the holding tank, and includes a first outlet and a second outlet. The plurality of junctions includes a first junction associated with the first outlet, and a second junction associated with the second outlet. The first junction is configured to direct agricultural product to flow out of the first outlet until the first outlet becomes blocked, and to thereafter direct agricultural product to flow toward the second junction. The second junction is configured to direct agricultural product to flow out of the second outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DEERE & COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harmon, Andrew W Geneseo, US 50 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00