Two-component coating composition, method for coating a substrate, coated substrate, and use of such coating composition for improving erosion resistance

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234373
APP PUB NO 20210363382A1
SERIAL NO

17277526

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a two-component coating composition comprising: i) a base component comprising a di-amine resin, and ii) a curing component comprising a polyisocyanate prepolymer, wherein the two-component coating composition comprises less than 5 wt % of polyol resin. The present disclosure further relates to a method for coating a substrate using such two-component coating composition, to a coated substrate obtainable by such method, and to use of such coating composition for improving erosion resistance of a substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AKZO NOBEL COATINGS INTERNATIONAL B.V.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bölke, Oliver Cloppenburg, DE 2 0
Becker, Sandra Varel, DE 4 13
Hohnholz, Dieter Gross Ippener, DE 6 16
Piecha, Christoph Stadland, DE 7 13
Seeger, Dirk Oldenburg, DE 14 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00