Lubricants having improved oxidation and deposit control performance

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234422
APP PUB NO 20230348807A1
SERIAL NO

17924616

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a deposit resistant fluid includes combining a base stock and one or more additives to form a blended fluid configured to resist forming deposits in an oxidizing environment. The base stock has a viscosity index of at least 80, and either a kinematic viscosity at 40° C. of at least 320 cSt or a kinematic viscosity at 100° C. of at least 14 cSt. The base stock includes greater than or equal to about 90 wt % saturates, less than or equal to about 10 wt % aromatics, and a sum of terminal/pendant propyl groups and terminal/pendant ethyl groups of at least 1.7 per 100 carbon atoms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL TECHNOLOGY AND ENGINEERING COMPANYTECH & IP LAW – LOC 101 (NEIGHBORHOOD 5B) 22777 SPRINGWOODS VILLAGE PARKWAY SPRING TX 77389

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Henderson, Camden N Winder, US 9 24
Kanga, Percy R Cherry Hill, US 4 13
Yeh, Lisa I Marlton, US 8 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00