Martensitic stainless steel seamless pipe for oil country tubular goods, and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234525
APP PUB NO 20220074009A1
SERIAL NO

17291150

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure is intended to provide a martensitic stainless steel seamless pipe for oil country tubular goods having high strength and excellent sulfide stress corrosion cracking resistance and a method for manufacturing thereof. The martensitic stainless steel seamless pipe for oil country tubular goods has a composition that contains, in mass %, C: 0.0100% or more, Si: 0.5% or less, Mn: 0.25 to 0.50%, P: 0.030% or less, S: 0.005% or less, Ni: 4.6 to 8.0%, Cr: 10.0 to 14.0%, Mo: 1.0 to 2.7%, Al: 0.1% or less, V: 0.005 to 0.2%, N: 0.1% or less, Ti: 0.06 to 0.25%, Cu: 0.01 to 1.0%, and Co: 0.01 to 1.0%, in which C, Mn, Cr, Cu, Ni, Mo, W, Nb, N, and Ti satisfy predetermined relations, and the balance is Fe and incidental impurities. The martensitic stainless steel seamless pipe has a yield stress of 758 MPa or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JFE STEEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Endo, Mami Tokyo, JP 25 296
Kamo, Yuichi Tokyo, JP 23 65
Yuga, Masao Tokyo, JP 56 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00