Medium-carbon boron-containing steel and controlled rolling and controlled cooling method for on-line normalizing treatment

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234537
APP PUB NO 20240240294A1
SERIAL NO

18560168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a medium-carbon boron-containing steel. The chemical components of the medium-carbon boron-containing steel are as follows in mass percentage: 0.37-0.45% of C; 0.17-0.37% of Si; 0.60-0.90% of Mn; 0.020-0.060% of Al; 0.0008-0.0035% of B; 0.030-0.060% of Ti; P≤0.025%; S≤0.025%; Cr≤0.25%; Ni≤0.20%; Mo≤0.10%; Cu≤0.20%; and the remainder is Fe and inevitable impurities. The controlled rolling and controlled cooling method suitable for the on-line normalizing treatment of medium-carbon boron-containing steel sequentially comprises the following steps: heating, rough rolling, finishing rolling, cooling by passing through water, and cold bed slow cooling. The medium-carbon boron-containing steel can meet the requirements of having a hardness of 190-220 HBW, an actual grain size that is ≥7 grade, and a banded structure that is ≤2 grade.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAYE SPECIAL STEEL CO LTD435001 NO 316 HUANGSHI AVENUE HUANGSHI HUBEI HUANGSHI CITY HUBEI PROVINCE 435001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Ping Hubei, CN 557 5577
He, Yingwu Hubei, CN 1 0
Huang, Guopiao Hubei, CN 1 0
Ling, Xin Hubei, CN 2 0
Zhang, Nian Hubei, CN 7 21
Zheng, Wenchao Hubei, CN 6 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00