Energy recovery valve system with lateral flow valve for controlling the fluid flow in a duct

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234798
APP PUB NO 20230287859A1
SERIAL NO

18002772

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A valve system for controlling the fluid flow in a duct, includes: a valve body adapted to be inserted in an interruption of the duct, and provided with an inlet and an outlet for a flow of fluid in the duct, a lateral flow valve, developing substantially transversally in the duct, placed in the valve body upstream of the fluid flow, the valve having an obstructer capable of moving transversally in the duct to “laterally” interrupt part of the fluid flow in the duct, an actuator adapted to move the obstructer from a first position, in which the duct is fully open, to a second position, in which the duct is fully closed, a rotor shaped substantially as a turbine, placed inside the valve body downstream of the valve with respect to the fluid flow, the rotor being located at a distance from the valve comprised within a pressure recovery zone, the pressure being generated by the valve in the absence of the turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • POLITECNICO DI MILANO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Malavasi, Stefano Milan, IT 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00