System and method for producing a control signal of an electric vertical take-off and landing (eVTOL) aircraft

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12235657
APP PUB NO 20240103534A1
SERIAL NO

18199580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for producing a control signal of an electric vertical take-off and landing (eVTOL) aircraft includes a flight controller configured to obtain a requested aircraft force, generate an optimal command mix, wherein the optimal command mix includes a plurality of commands to a plurality of actuators as a function of the requested aircraft force, wherein generating further comprises receiving an ideal actuator model includes at least a performance parameter, producing a model datum as a function of the ideal actuator model, and generating the optimal command mix as a function of the request aircraft force and the model datum, and produce a control signal as a function of the optimal command mix.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BETA AIR, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wiegman, Herman Essex Junction, US 166 542

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00