Multilayer ceramic capacitor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12237111
APP PUB NO 20240087808A1
SERIAL NO

18509396

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer ceramic capacitor includes a capacitor main body including a multilayer body and external electrodes, the multilayer body including dielectric layers and internal electrode layers stacked alternately, each of the external electrodes being provided on an end surface in a length direction of the multilayer body and being connected to the internal electrode layers, and two interposers on one surface in a stacking direction of the capacitor main body and spaced apart from each other in the length direction, the interposers including bonding surfaces bondable to the one surface of the capacitor main body and including inner edge portions which are opposite to each other and each having a length longer than a length in a width direction of the multilayer body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kimura, Masato Nagaokakyo, JP 49 450

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00