Snowboards, skis and method of manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12239899
APP PUB NO 20220314101A1
SERIAL NO

17301437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Snowboards are constructed by initial manufacture of a base sub-assembly including fewer than all layers of the snowboard, e.g., a base layer, edges, and a stabilizing layer. These layers are permanently bonded together into a unitary base sub-assembly. The running (bottom) surface is then finished to provide a desired surface consistency by eliminating undesired irregularities from the manufacturing process, e.g., using a conventional base grinding machine. Subsequently, the base sub-assembly and remaining snowboard layers (e.g., top sheet and a core sandwiched between reinforcing layers) are permanently bonded together into a unitary final snowboard assembly, which may then be worked to form a finished snowboard. Snowboards may be either flat or non-flat in both the longitudinal and transverse directions. Accordingly, the method may be used to produce snowboards having a desired sanded/ground base surface having a desired surface consistency, even for snowboards that are non-flat in the transverse direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SWS SPORTS BOARDS INDUSTRIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cant, George Dubai, AE 7 53
Colvin, John Dubai, AE 7 35
Nouhra, Rainier Dubai, AE 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00