System and method for inspecting components fabricated using a powder metallurgy process

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12240042
APP PUB NO 20240024955A1
SERIAL NO

17813634

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for nondestructive testing includes steps of: (1) forming a first inspection standard using a metal injection molding process; (2) forming a second inspection standard using the metal injection molding process; and (3) creating a reference library that includes the first inspection standard and the second inspection standard. The first inspection standard includes first voids that are induced by a first set of conditions of a sintering operation and a hot isostatic pressing operation of the metal injection molding process. The second inspection standard includes second voids that are induced by a second set of the conditions of the sintering operation and the hot isostatic pressing operation. At least one of the conditions in the second set of the conditions is different than at least one of the conditions of the first set of the conditions. The first voids and the second voids are different.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE BOEING COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pecina, Joseph A Lynnwood, US 9 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00