Five-axis vertical processing system for automatic loading and unloading

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12240071
APP PUB NO 20220274219A1
SERIAL NO

17632910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a five-axis vertical machining system with automatic loading and unloading, including a feeding mechanism, a loading mechanism, and a numerical control machine tool. The feeding mechanism is arranged in front of a ram assembly, and the feeding mechanism drives a raw material to move along an X axis and/or a Y axis of the numerical control machine tool; the loading mechanism is fixed on the ram assembly; and the loading mechanism moves along a Z axis of the numerical control machine tool to drive the raw material onto a cradle assembly of the numerical control machine tool. The present invention realizes an automatic loading and unloading function by setting a feeding mechanism capable of automatic feeding and a loading mechanism with automatic loading to cooperate with each other, thereby improving the working efficiency and saving manpower.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KEDE NUMERICAL CONTROL CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hu Liaoning, CN 113 448
Du, Changlin Liaoning, CN 11 2
Ju, Zidan Liaoning, CN 9 1
Li, Yapeng Liaoning, CN 43 39
Li, Yinghua Liaoning, CN 15 287
Song, Mingshan Liaoning, CN 5 2
Wang, Feng Liaoning, CN 857 9908
Wang, Lianyang Liaoning, CN 5 1
Yu, Shengfeng Liaoning, CN 2 1
Zhang, Haibo Liaoning, CN 109 618
Zhang, Jian Liaoning, CN 1504 17611

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00