Working machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12241228
APP PUB NO 20220235535A1
SERIAL NO

17583175

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric or hybrid working machine includes a ground engaging structure, an electrical source of power, an electric motor arrangement, one or more hydraulically actuated devices, and a hydraulic pump configured to supply hydraulic fluid to the one or more hydraulically actuated devices. The working machine also includes a transmission operable to transmit drive from the electric motor arrangement to the ground engaging structure and the hydraulic pump. The transmission has a first input member connected to a first electric motor, a drive train comprising a first input gear connected to the first input member, and a coupling device connected between the first input member and the first input gear to selectively adjust transmission of drive to the hydraulic pump and the ground engaging structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • J. C. BAMFORD EXCAVATORS LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ford, Kevin Uttoxeter, GB 9 26
Williams, Alan Geoffrey Uttoxeter, GB 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00