Cement composition and its relation with compressive strength

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12241333
APP PUB NO 20210172280A1
SERIAL NO

16632462

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for designing a cement composition may include: providing a target compressive strength and a target composition density; selecting at least one cementitious material from a plurality of cementitious materials; calculating a required amount of water to produce a cement composition with the target composition density, the cement composition comprising the water and the at least one cementitious material; calculating a compressive strength of the cement composition based at least in part on a model of compressive strength; comparing the calculated compressive strength to the target compressive strength; and preparing the cement composition with the calculated compressive strength.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jandhyala, Siva Rama Krishna The Woodlands, US 46 36
Morgan, Ronnie Glen Waurika, US 58 652
Pang, Xueyu Tomball, US 24 91
Pisklak, Thomas Jason Cypress, US 130 998
Singh, John Paul Bir Kingwood, US 49 91
Yerubandi, Krishna Babu Houston, US 25 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00