Xenon lamp power supply, purification device and refrigeration device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12245622
APP PUB NO 20230189849A1
SERIAL NO

17925316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An xenon lamp power supply, a purification device, and a refrigeration device are provided. The xenon lamp power supply comprises: an input circuit, a coupling assembly, an output circuit, and a control circuit. The input circuit comprises an alternating-current input end and a direct-current output end, and the input circuit is used for converting alternating current input by the alternating-current input end into direct current output by the direct-current output end. A first end of the coupling assembly is connected to the direct-current output end. The output circuit comprises a xenon lamp power supply circuit, and the xenon lamp power supply circuit is connected to a second end of the coupling assembly, so as to convert electric energy from the second end into direct-current power, and then supply power to a xenon lamp.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HEFEI MIDEA REFRIGERATOR CO., LTD.; HEFEI HUALING CO., LTD.; MIDEA GROUP CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ma, Zhuobiao Hefei, CN 1 0
Zhang, Zhen Hefei, CN 498 4584

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00