Ventilation outlet with a control element and an actuating knob

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12246575
APP PUB NO 20230147414A1
SERIAL NO

18051288

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a ventilation outlet including one or more flow directing elements arranged movably in a housing and with an actuating element mounted movably on the housing with an actuating knob for actuating at least one flow directing element for controlling a ventilation gas flow and with a light source for illuminating the actuating knob. A movable mounting of the actuating element permits a movement of the actuating element with at least one degree of freedom and the light source is arranged outside the actuating knob in such a way that light can be coupled into the actuating knob and at least partially illuminates an operating side of the actuating knob from the inside.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FAURECIA INNENRAUM SYSTEME GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doll, Volker Ranschbach, DE 22 139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00