Transmission line

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12249441
APP PUB NO 20240153670A1
SERIAL NO

18277478

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transmission line including a conductor and a dielectric layer, wherein the dielectric layer includes plural bubbles and plural acicular nucleating agents, and when, based on observed lengths of the plurality of acicular nucleating agents observed in a cross section of the dielectric layer, the nucleating agents having lengths longer than a median value of the observed lengths are classified into a long nucleating agent group and the nucleating agents having lengths shorter than the median value of the observed lengths are classified into a short nucleating agent group, an average length of the nucleating agents in the long nucleating agent group is 3.5 times or less an average length of the nucleating agents in the short nucleating agent group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JUNKOSHA INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sato, Ryo Ibaraki, JP 162 1071

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00