Bone grinder promoting bone osteoinductivity

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12251495
APP PUB NO 20240252721A1
SERIAL NO

18532697

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bone grinder may have a grinding chamber, an intermediate zone, and a primary cutting element and a secondary cutting element. The intermediate zone may have a first wall and a second wall within the grinding chamber, and the intermediate zone may separate the primary cutting element from the secondary cutting element. The first wall and the second wall may slope inward such that a distance between the first wall and the second wall generally decreases from the primary cutting element to the secondary cutting element. The primary cutting element and the secondary cutting element may be positioned within the grinding chamber to sequentially perform primary cutting operations and secondary cutting operations on a bone. A drive mechanism may operatively engage the primary cutting element and the secondary cutting element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meredith, Thomas L Brentwood, US 9 160

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00