Coolant connection structure for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12252002
SERIAL NO

17830812

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coolant connection structure includes an upper body fastened to an upper end portion of the vehicle, a lower body positioned at a lower end portion of the upper body, a floor panel formed between the upper body and the lower body, and a joint module positioned at the floor panel and fluidly connected to a coolant tank positioned at the lower body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANYSEOUL 06797
KIA CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Seong Min Seoul, KR 4 0
Ji, Byoung Hyun Goyang-Si, KR 5 1
Kwon, Dong Ho Yongin-Si, KR 49 55
Lee, Sang Shin Suwon-Si, KR 150 478
Lee, Yoon Hyung Seongnam-Si, KR 32 49
Shin, Gee Young Suwon-Si, KR 54 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00