Process and device for producing hydrogen, carbon monoxide and a carbon-containing product

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12252405
APP PUB NO 20210380417A1
SERIAL NO

17309737

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for producing hydrogen, carbon monoxide and a carbon-containing product in at least one reaction apparatus, wherein the at least one reaction apparatus comprises a bed of carbon-containing material and is characterized in that the bed of carbon-containing material in the at least one reaction apparatus is alternately heated to a temperature of >800° C. and, no later than upon reaching a temperature of 1800° C., cooled to a maximum of 800° C., wherein hydrogen and carbon monoxide are produced during the heating phase and carbon and hydrogen are produced during the cooling phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THYSSENKRUPP UHDE GMBH; THYSSENKRUPP AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Antweiler, Nicolai Essen, DE 9 0
Büker, Karsten Dortmund, DE 7 17
Bode, Andreas Wezembeek-Oppem, BE 65 946
Scheiff, Frederik Deidesheim, DE 15 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00