Copper halide layers

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12252784
APP PUB NO 20220380893A1
SERIAL NO

17618217

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Articles are described including a substrate and a copper halide layer on the substrate, where the interfacial free energy between the substrate and the copper halide layer allows the copper halide layer to form continuously, wherein the copper halide layer conforms to the shape of the substrate. The articles may further include an adhesion layer disposed in-between the substrate and the copper halide layer, where the surface free energy between the adhesion layer and the copper halide layer allows the copper halide layer to form continuously, wherein the copper halide layer or the adhesion layer conform to the shape of the substrate. Also described are methods of forming an article using chemical vapor deposition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PRESIDENT AND FELLOWS OF HARVARD COLLEGE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Christina M Cambridge, US 1 2
Davis, Luke M Cambridge, US 3 7
Gordon, Roy Gerald Cambridge, US 24 359

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00