Flexible power plant based on supercritical carbon dioxide power circulation in combination with seawater desalination and control method of same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253011
APP PUB NO 20240295180A1
SERIAL NO

18258832

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flexible power plant based on supercritical carbon dioxide power circulation is provided. The plant includes a heat source circulation system, a thermodynamic circulation system, a desalination system and a control system. The heat source circulation system is connected to the thermodynamic circulation system and the seawater desalination system, and provides heat source required for their operations, respectively; the control system is simultaneously connected to respective actuators of the heat source circulation system, the thermodynamic circulation system and the seawater desalination system, and controls their operations, correspondingly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHINA THREE GORGES CORPORATION; THE SECOND XIANGYA HOSPITAL, CENTRAL SOUTH UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Xinxing Beijing, CN 5 0
Su, Wen Changsha, CN 17 92
Wang, Qian Beijing, CN 584 3513
Yin, Likun Beijing, CN 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00