Hydrogen-fuelled gas turbine power system and method for its operation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253022
APP PUB NO 20220275753A1
SERIAL NO

17637589

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Hydrogen-fueled gas turbine power system comprising a compressor (22), a combustor (24) and a turbine (26) as well as a fuel supply device (10). The fuel supply device (10) has the form of a hydrogen gas producing reactor system with at least one reactor (12) based on sorption enhanced steam methane reforming (SE-SMR) and/or sorption enhanced water gas shift (SE-WGS) of syngas. The reactor (12) is connected in a closed loop with a regenerator (14) for circulating and regenerating a CO2 absorber between the reactor (12) and the regenerator (14). Additionally, there is a closed heat exchange loop (21) between the regenerator (14) of the hydrogen gas producing reactor system (10) and the downstream end of the combustor (24) or the upstream end of the turbine (26). A method of its use is also contemplated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ZEG POWER AS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Di, Giulio Nicola Oslo, NO 3 4
Mowill, Fredrik Oslo, NO 1 0
Råheim, Arne Maura, NO 1 0
Ryengen, Kathrine Slattum, NO 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00