Electronic device comprising substrate assembly including two types of transistors

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253780
APP PUB NO 20230359097A1
SERIAL NO

18216182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate assembly includes: a substrate; a first transistor disposed on the substrate, wherein the first transistor includes a first semiconductor layer and the first semiconductor layer is a silicon semiconductor layer; and a second transistor disposed on the substrate, wherein the second transistor includes a second semiconductor layer and a drain electrode electrically connected to the second semiconductor layer, and the second semiconductor layer is an oxide semiconductor layer, wherein the first semiconductor layer of the first transistor is electrically insulated from the drain electrode of the second transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHIMEI INNOLUX CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Nai-Fang Miao-Li County, TW 38 162
Lee, Kuan-Feng Miao-Li County, TW 510 1348
Lius, Chandra Miao-Li County, TW 155 357

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00