Integrated electro-optic frequency comb generator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12253786
APP PUB NO 20240012308A1
SERIAL NO

18213771

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated electro-optic frequency comb generator based on ultralow loss integrated, e.g. thin-film lithium niobate, platform, which enables low power consumption comb generation spanning over a wider range of optical frequencies. The comb generator includes an intensity modulator, and at least one phase modulator, which provides a powerful technique to generate a broad high power comb, without using an optical resonator. A compact integrated electro-optic modulator based frequency comb generator, provides the benefits of integrated, e.g. lithium niobate, platform including low waveguide loss, high electro-optic modulation efficiency, small bending radius and flexible microwave design.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYPERLIGHT CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Luke, Kevin Cambridge, US 22 49
Reimer, Christian Wellesley, US 46 90
Zhang, Mian Cambridge, US 44 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00