Positive electrode active material for secondary battery, method of preparing the same, and lithium secondary battery including the positive electrode active material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12255317
SERIAL NO

17601526

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A positive electrode material for a secondary battery and a method of making the same is disclosed herein. In some embodiments, a positive electrode active material includes a lithium composite transition metal oxide including nickel (Ni), cobalt (Co), and manganese (Mn), wherein the lithium composite transition metal oxide includes 60 mol % or more of the nickel (Ni) among metals excluding lithium, and a coating layer is formed on surfaces of particles of the lithium composite transition metal oxide, wherein the coating layer includes a lithium-polymer compound which is formed by a reaction of a lithium by-product with a polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Dong Joon Daejeon, KR 14 2
Lim, Jung Ho Daejeon, KR 14 26
Yoon, Yeo June Daejeon, KR 11 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00