Power tool and electronic control device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12255499
APP PUB NO 20220271624A1
SERIAL NO

17744146

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power tool includes a main body and a battery pack. The main body includes a housing and a motor, a switch assembly, and an electronic control device. The electronic control device is electrically connected to the switch assembly and the motor. The electronic control device includes an electronic control assembly, a mounting base, and a connecting assembly. The electronic control assembly includes a power circuit board. The power circuit board is provided with an opening. The connecting assembly conductively connects the battery pack to the electronic control assembly, connects to the mounting base via the opening, and mates with the mounting base to form a mounting space in which the electronic control assembly is mounted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NANJING CHERVON INDUSTRY CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duan, Junya Nanjing, CN 21 111
Fan, Yanfeng Nanjing, CN 3 2
Feng, Jifeng Nanjing, CN 20 24
Li, Baoshan Nanjing, CN 2 2
Min, Yuemei Nanjing, CN 2 3
Teng, Peng Nanjing, CN 7 6
Wang, Huaishu Nanjing, CN 10 10
Yang, Qingsong Nanjing, CN 16 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00