Power tool including a printed circuit board with a high impedance trace

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12255501
APP PUB NO 20230378853A1
SERIAL NO

18310718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power tool includes a housing having a motor housing portion and a handle portion. A motor having a motor axis is positioned within the motor housing portion. The power tool further includes a first printed circuit board positioned within the motor housing portion. The first printed circuit board intersects the motor axis. The power tool also includes a second printed circuit board positioned within the motor housing. The second printed circuit board intersects the motor axis. The second printed circuit board includes a conductive high impedance trace that is configured to interrupt electric power to the motor in response to a current that exceeds a current limit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MILWAUKEE ELECTRIC TOOL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ellena, Mitchell A West Allis, US 11 0
Glennon, Jack J Milwaukee, US 2 0
Khatib, Ryan A Waukesha, US 1 0
Rajendran, Lokeshwaran West Allis, US 7 0
Seiler, Noah P Milwaukee, US 2 0
Tomcheck, Daniel J Denmark, US 6 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00