Power system combining photovoltaic power generation and hydrogen power generation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12255573
APP PUB NO 20240322738A1
SERIAL NO

18679473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a power system combining photovoltaic power generation and hydrogen power generation, including: a building, a photovoltaic power generation device being installed on an upper end surface of the building, and a first inverter being installed on an output end of the photovoltaic power generation device through a connecting line; a water electrolysis hydrogen production equipment being installed inside a building, a first hydrogen storage tank being installed on one side of the building, a second hydrogen storage tank being installed on the other side of the building, and an oxygen storage tank being connected to an output end of the water electrolysis hydrogen production equipment through a pipeline. In the disclosure, there is no need to provide a special storage battery to store the electricity generated by photovoltaic power generation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ren, Weidong Hangzhou, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00