Energy storage and striking mechanisms and nail guns having same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12257681
APP PUB NO 20240091920A1
SERIAL NO

18368815

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nail gun having an energy storage mechanism for storing energy used for striking nails out of the nail gun, the energy storage mechanism comprises a guiding rod attached to a fixed plate assembly; a piston disposed on the guiding rod; a striking member mounted on the piston for striking the nails; at least one power spring disposed around an outer periphery of the guiding rod; a guide sleeve moveably disposed around the outer periphery of the guiding rod and between the power spring and the guiding rod; wherein a first end of the power spring abuts against the piston and is configured to be compressed to store energy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIZHOU DAJIANG IND CO LTD317500 ELECTROMECHANICAL PARK WENLING INDUSTRIAL CITY TAIZHOU CITY ZHEJIANG PROVINCE TAIZHOU CITY ZHEJIANG PROVINCE 317500

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Jinquan Wenling, CN 32 147
Li, Haijun Wenling, CN 52 376
Yang, Mingjun Wenling, CN 54 69
Yang, Tao Wenling, CN 500 4805
Zhou, Weirong Wenling, CN 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00