Ecological slope anti-corrosion timber pile, and treatment device and treatment method therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12257737
APP PUB NO 20250018596A1
SERIAL NO

18903079

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are an ecological slope anti-corrosion timber pile and a treatment device and method therefor, belonging to the field of ecological engineering. The device includes a gasification furnace, and first, second and third carbonization chambers, each internally provided with a main gas pipeline, and multiple rows of radially distributed branch gas pipes are vertically disposed thereon and provided with electronic igniters. Multiple rows of radially distributed timber piles are vertically inside the carbonization chambers and between the branch gas pipes. The gasification furnace is connected to the main gas pipeline of the first carbonization chamber through a gas booster pump. The first carbonization chamber is connected to an air blower, the first and second carbonization chambers are connected through a joint pipe, the second and third carbonization chambers are connected through a pipeline, and the third carbonization chamber is connected to the gasification furnace through a gas delivery pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HARBIN NORMAL UNIVERSITY150000 NANGANG DISTRICT AND NO 50 XINGLU ROAD HARBIN CITY HEILONGJIANG PROVINCE HARBIN CITY HEILONGJIANG PROVINCE 150000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Hanxi Harbin, CN 1 0
Zang, Shuying Harbin, CN 1 0
Zhang, Hongjun Harbin, CN 73 457

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00