Systems for bulk blending of cement powders

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12257740
APP PUB NO 20210039278A1
SERIAL NO

16985472

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bulk storage plant for providing cement mixtures oil well construction is disclosed. The bulk storage plant includes bulk storage sources, an additive station, a weigh batcher, and a tumble blender. The bulk storage sources are adapted to contain cement ingredients. The additive station is adapted to provide an additive for adjusting cement properties. The weigh batcher is connected to the bulk storage silos and the additive station. The weigh batcher is adapted to receive the cement ingredients from the bulk storage sources and the additive from the additive station. The tumble blender is connected to the weigh batcher and is adapted to receive the cement ingredients and the additive from the weigh batcher. The tumble blender is adapted to blend the ingredients and provide the blended ingredients to one of a temporary storage silo and a storage vessel for transport to the oil well site.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADAPTIVE INDUSTRIAL INC1270 EARNHARDT SHOP ROAD MOUNT PLEASANT NC 28124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cook, Roger Derek Mount Pleasant, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00