Flexible tube production apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12257758
APP PUB NO 20230249387A1
SERIAL NO

18102986

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A die has an inner die that has a straight portion of circular columnar outer shape and a convergent tapered portion provided closer to an extrusion port side than the straight portion and an outer die that houses the inner die. A first supply passage connecting a first valve and a flow passage, a second supply passage connecting a second valve and the flow passage, and a third supply passage connecting a third valve and the flow passage are provided inside the die. Downstream side end portions of the first supply passage and the second supply passage are connected to a portion of the flow passage formed between the straight portion and the outer die and a downstream side end portion of the third supply passage is connected to a portion of the flow passage formed between the tapered portion and the outer die.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PLA GIKEN CO LTDSUITA-SHI OSAKA 5640051

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kikuzawa, Yoshiharu Osaka, JP 8 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00