System for introducing an additive into a container comprising a static microdoser

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258253
APP PUB NO 20230091547A1
SERIAL NO

17904541

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a system for introducing an additive into a container (2). The system comprises an automated device for transporting the container (2) in a horizontal plane (P), such as a rotary wheel. The system further comprises a static microdoser (5) having a nozzle from which a jet (7) of an additive issues upon passage of an opening of the container (2). Additive is so injected into said container (2). According to the invention, the nozzle of the static microdoser (5) is inclined relative to a direction orthogonal to said horizontal plane (P). This limits splashing, in particular when the jet (7) of additive hits an inner wall of the container (2) that is free of liquid. This can be facilitated by an acceleration applied on the container (2) which inclines the free surface (8) of the liquid material present in the container (2). A preferred application is the introduction of a flavored concentrate into a bottle of water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOCIETE DES PRODUITS NESTLE S A1800 VEVEY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Comin, Andrea Nancy, FR 9 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00