Method of manufacture and assembly of XY flexure mechanism assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258263
SERIAL NO

18605411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing and assembling a sandwich flexure mechanism assembly is set forth herein. The method involves manufacture of a monolithic sandwich flexure module having a multitude of out of plane rigid inter-stage connections between at least some sets of twin stages of the monolithic sandwich flexure module. The method further involves assembling an interconnect subassembly to intermediate bodies of the monolithic sandwich flexure module. The interconnect subassembly furnishing in-plane rigid inter-stage connections between pairs of the intermediate bodies that constitute sister stages of the monolithic sandwich flexure module. The method can further involve assembling a motion body, actuators, and displacement sensors at the monolithic sandwich flexure module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE REGENTS OF THE UNIVERSITY OF MICHIGAN1600 HURON PARKWAY 2ND FLOOR ANN ARBOR MI 48109

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Awtar, Shorya Ann Arbor, US 44 1533
Ho, Kwun Sing Roger Ann Arbor, US 1 0
Rath, Siddharth Ann Arbor, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00