Polymer composition for blow molding including waste separator with inorganic coating and molded article manufactured therefrom

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258464
APP PUB NO 20240059879A1
SERIAL NO

18327170

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a polymer composition for blow molding which includes a high-density polyethylene recovered from a secondary battery separator and has excellent mechanical properties. The polymer composition having excellent processability may be prepared by recycling a secondary battery separator, and may be molded to manufacture an environmental small to medium sized container which has excellent mechanical properties such as flexural strength, elongation, and impact strength in a large temperature range and has excellent processing moldability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SK INNOVATION CO LTDSEOUL 03188
SK GEO CENTRIC CO LTD51 JONG-RO JONGNO-GU SEOUL 03161

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheon, Si Uk Daejeon, KR 7 0
Cho, Kyu Young Daejeon, KR 28 46
Kim, Yun Bong Daejeon, KR 33 38
Park, Jong Sang Daejeon, KR 16 200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00