Process for producing a coated substrate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258484
APP PUB NO 20210395555A1
SERIAL NO

17250976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a process. In an embodiment, the process includes forming an aqueous matte coating composition including A1) beads of a first acrylic polymer having an average particle diameter from 0.1 μm to 2 μm; A2) beads of a second acrylic polymer having an average particle diameter from 0.5 μm to 30 μm; B) an acrylic polymer binder; C) from 0.15 wt % to 2.5 wt % of a slip additive; D) from 0.10 wt % to 0.30 wt % of a defoaming agent; E) from 0.8 wt % to 1.5 wt % of a rheology modifier; and F) from 0.01 wt % to 0.1 wt % of at least one wetting agent. The aqueous matte coating composition is applied to a substrate and then dried to form a coating on the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOW GLOBAL TECHNOLOGIES LLC2040 DOW CENTER MIDLAND MI 48674

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Yinzhong Lake Jackson, US 37 64
Lai, Yuming Midland, US 10 15
Sekharan, Manesh Nadupparambil Freeport, US 18 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00