Integrated hydraulic power device and fire truck

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12258981
APP PUB NO 20240318671A1
SERIAL NO

18306642

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to an integrated hydraulic power device and a fire truck. The integrated hydraulic power device includes: an integrated valve including a valve body having an internal flow passage structure, a first mounting end and a second mounting end; a motor fixedly arranged at the first mounting end; a hydraulic oil tank fixedly arranged at the second mounting end; and a hydraulic pump located within the hydraulic oil tank and in drive connection with the motor, wherein the hydraulic pump has an oil suction port for drawing oil from the hydraulic oil tank, and the internal flow passage structure is communicated with the hydraulic oil tank and the hydraulic pump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JIANGSU XCMG CONSTRUCTION MACHINERY RESEARCH INSTITUTE LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bo, Fuxiang Xuzhou, CN 5 0
He, Bing Xuzhou, CN 44 618
Lu, Liangwei Xuzhou, CN 2 1
Wang, Shuaitong Xuzhou, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00