Burner block assembly for an industrial furnace

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12259131
SERIAL NO

18749532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An industrial furnace burner block assembly is presented herein. The assembly includes a mounting plate defining a fire tube extending there from. A plurality of tabs extend from the mounting plate and engage a corresponding groove or slot formed on a refractory burner block. The burner block includes four block sections that each allow for independent thermal growth during operation. The burner block also defines a center aperture collectively formed by corresponding internal surfaces of the independent block sections. A sealing ring is mounted within a groove in the burner aperture and is disposed in a sealing relation with an external surface of the firing tube. A tongue-and-groove connection assembly is formed on mating surfaces between adjacent burner block sections. The tongue-and-groove connection assembly and the sealing ring each provide a gas-tight seal that restricts gas bypassing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RUDELL RODNEY WPEARLAND TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rudell, Rodney W Pearland, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00