Multibridge power converter with multiple outputs

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12261516
APP PUB NO 20230421042A1
SERIAL NO

18367893

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one aspect of the present disclosure, there is provided a power converter apparatus that includes at least two switching bridges connected to a Direct Current (DC) bus and both generating pulse-width-modulated (PWM) voltages to non-isolated outputs, and an isolation transformer having a primary winding connected across the outputs of the two switching bridges and a secondary winding connected to isolated outputs. In a non-isolated mode, the two switching bridges are configured to operate in a parallel mode, and power is transferred between the DC bus and the non-isolated outputs. In an isolated mode, the two switching bridges are configured to operate in a full bridge mode, and power is transferred between the DC bus and the isolated outputs through the transformer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHU HUIBINNEW YORK UNITED STATES NEW YORK

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhu, Huibin Slingerlands, US 39 297
Zhu, Karen Ming Slingerlands, US 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00