Selective retransmissions on a non-orthogonal channel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12262245
APP PUB NO 20240008040A1
SERIAL NO

17853784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for wireless communication is provided. The apparatus may be a network node. The apparatus receives a set of uplink transmissions from a set of user equipments (UEs) via a first resource of a non-orthogonal channel, wherein the apparatus is unable to decode the set of uplink transmissions. The apparatus transmits a retransmission request to a subset of the set of UEs. The apparatus receives a retransmission of a first uplink transmission in the set of uplink transmissions via a second resource of the non-orthogonal channel in response to the retransmission request. The apparatus decodes a second uplink transmission in the set of uplink transmissions based on at least the retransmission of the first uplink transmission.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwak, Yongjun San Diego, US 314 3241
Kwon, Hwan Joon San Diego, US 392 724
Sen, Pinar San Diego, US 40 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00