Transparent electrode, process for producing transparent electrode, and photoelectric conversion device comprising transparent electrode

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12262571
APP PUB NO 20220209151A1
SERIAL NO

17469723

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present embodiment provides a transparent electrode, a transparent electrode production process and a photoelectric conversion device. The transparent electrode comprises a patterned electrode layer formed on a transparent substrate. The electrode layer has an electroconductive film containing metal nanowires and also has a film of N-graphene. In the graphene carbon skeleton of the N-graphene, carbon atoms are partly substituted with nitrogen atoms. The transparent electrode can be produced by: forming an electroconductive layer by coating with a dispersion containing metal nanowires; then forming an N-graphene film thereon; and subsequently patterning them.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBAMINATO-KU TOKYO 105-8001
TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATIONKAWASAKI-SHI KANAGAWA 212-0013

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Naito, Katsuyuki Bunkyo, JP 124 1458
Saita, Yutaka Yokohama, JP 31 7
Shida, Naomi Minato, JP 75 967

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00