Transport refrigeration system with battery temperature control

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12263718
APP PUB NO 20230286354A1
SERIAL NO

18179100

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transport refrigeration system includes a compressor, condenser and evaporator configured to circulate a refrigerant; a motor configured to drive the compressor; a battery and power electronics configured to power the motor; an ambient air temperature sensor configured to monitor ambient air at the battery; a cooling unit configured to cool the power electronics; a controller, wherein the controller is configured to: receive an ambient air temperature of the compartment housing the battery; compare the ambient air temperature to a temperature threshold; and based at least in part on the comparing the ambient air temperature to the temperature threshold, performing at least one of (i) modify a cooling rate of the cooling unit and (ii) modify an operating parameter of the power electronics.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARRIER CORPORATION13995 PASTEUR BLVD PALM BEACH GARDENS FL 33418

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
She, Xu Cohoes, US 41 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00