Vehicle frame and power supply assembly and related systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12263752
APP PUB NO 20200384882A1
SERIAL NO

16893507

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes data processing hardware and memory hardware. The memory hardware is in communication with the data processing hardware and stores instructions that when executed on the data processing hardware cause the data processing hardware to perform certain operations. The operations include receiving a temperature corresponding to a battery, and determining whether the temperature is greater than a predetermined threshold temperature. The operations also include, when the temperature is greater than the predetermined threshold temperature, actuating an ejector to eject the battery from a power supply assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVL MOBILITY TECHNOLOGIES INC47519 HALYARD DRIVE PLYMOUTH MI 48170

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Falls, Bruce Dove Canyon, US 12 73
Kochan, Scott San Jose, US 8 5
Lutz, Alwin Aliso Viejo, US 3 5
Moran, Brian Rancho Santa Margarita, US 42 2082
Quintana, Adrian Foothill Ranch, US 5 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00