Front frame structure for electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12263886
APP PUB NO 20240278839A1
SERIAL NO

18430039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A front frame structure for an electric vehicle includes front side frames disposed in extra spaces between left and right side walls in a vehicle width direction of a motor room and side surfaces of a power control unit; a frame-shaped rigid member disposed in an extra space in a front portion of the motor room; left and right impact absorbing members coupled to a front surface of the frame-shaped rigid member at positions directly facing the front side frames; a bumper beam coupling the impact absorbing members; a lower frame disposed in a lower portion of the motor room; and upper reinforcements coupled to upper surfaces of the front side frames. Outer side surfaces in the vehicle width direction of the upper reinforcements gradually protrude outward in the vehicle width direction from front ends toward rear ends of the upper reinforcements in a front-rear direction of a vehicle body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUBARU CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagasawa, Isamu Tokyo, JP 156 739

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00