Multilayered coating film and coated article

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12264260
APP PUB NO 20240018365A1
SERIAL NO

18252176

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer coating film includes a lustrous layer containing a luster material and a colored layer containing a reddish coloring agent, and having translucency. Regarding a Y value of an XYZ colorimetric system calibrated with a standard white plate, when a light incident angle is 45°, Y(5°) represents a Y value of reflected light measured at a light receiving angle of 5°, and Y(15°) represents a Y value of reflected light measured at a light receiving angle of 15°, the lustrous layer satisfies the following: Y(5°) is 30 or more to 700 or less; Y(15°)=k×Y(5°) (where k is a coefficient); and k is 0.01 or more to 0.3 or less. The concentration of the reddish coloring agent in the colored layer is 1 mass % or more to 17 mass % or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATIONHIROSHIMA 730-8670

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimoto, Tomohiro Hiroshima, JP 3 0
Kawase, Eiichi Hiroshima, JP 6 3
Nakamoto, Takayoshi Hiroshima, JP 7 14
Nonaka, Ryuji Hiroshima, JP 21 112
Okamoto, Keiichi Hiroshima, JP 25 274
Tamai, Kazuteru Hiroshima, JP 3 0
Teramoto, Kouji Hiroshima, JP 32 58
Yamane, Takakazu Hiroshima, JP 48 257

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00