NiCrMoNb age hardenable alloy for creep-resistant high temperature applications, and methods of making

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12264383
APP PUB NO 20240043967A1
SERIAL NO

18490286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Nickel alloys, methods of making nickel alloys, articles including the nickel alloys, uses of the alloys, and methods of treating nickel alloys are described. The inventive heat resistant structural materials are suitable for applications requiring high yield stress at room temperature and good creep strength at high temperatures, such as in gas turbines, steam turbines, fossil energy boilers, aero engines, power generation systems using fluids such as supercritical carbon dioxide (e.g., advanced ultra-supercritical power plants), concentrated solar power plants, nuclear power plants, molten salt reactors: turbine blades, casings, valves, heat exchangers and recuperators.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BATTELLE MEMORIAL INSTITUTE902 BATTELLE BOULEVARD RICHLAND WA 99354

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Detrois, Martin Salem, US 4 0
Hawk, Jeffrey A Salem, US 8 10
Jablonski, Paul D Salem, US 13 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00