Energy capture device and system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12264645
SERIAL NO

17948859

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydroponic container growing system is provided. The growing system provides a closed growing environment providing climate and other growing conditions suitable for year-round plant production. The growing system may include a container having a plurality of subsystems therein. The plurality of subsystems may include a plant production system, an environmental regulation system, an energy capture system, a control system, and a dosage system. The plant production system may include an Ebb and Flow irrigation system and one or more Nutrient Film Technique (NFT) irrigation systems. A single reservoir may supply the Ebb and Flow irrigation system and a NFT irrigation system to provide a dual technique, single nutrient supply source irrigation system for plant production. An energy capture system which utilizes the kinetic energy of flowing liquid to generate electrical energy may be integrated into one or more irrigation systems within the plant production system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Owner owned or assignment not recorded

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Speetjens, Angela Dobson Mobile, US 1 0
Speetjens, Kenneth Dale Mobile, US 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00