Forming integrated electronic devices for converting and downscaling alternating current

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12267006
APP PUB NO 20230402937A1
SERIAL NO

17806670

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Bonding a full-bridge device and an LLC device in a stack, or forming the full-bridge device and the LLC device on a same substrate, rather than connecting the devices, reduces a chip area associated with a power converter including the full-bridge device and the LLC device. Additionally, the full-bridge device and the LLC device consume less power because parasitic inductance and capacitance are reduced. Additionally, raw materials and production time are conserved that would otherwise have been used to connect the full-bridge device and the LLC device (e.g., via wires).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTDHSINCHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Yen-Ku Zhubei, TW 3 0
Su, Ru-Yi Kouhu Township, TW 61 405
Tsai, Chun-Lin Hsin-Chu, TW 29 125
Wu, Haw-Yun Zhubei, TW 9 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00